Latest News
04.08.2015 Posted
By Alex Morris
/
Excellent progress continues within the extension at Preston
Service block flooring
The separation wall
75% of the floor cast
90% of the roof lighting & sprinklers
And as all that happens, the reel tracks are also being installed. Soon to be ready for the corrugator installation.


